Thursday, February 26


Nagpur: The Public Works Department (PWD) has begun constructing a temporary road near Ajni Bridge to ease mounting traffic congestion triggered by the ongoing underpass work. The stretch is being carved out by cutting through the central median to link the Kriplani Square–Ajni Bridge Square road with the newly constructed bypass towards Congress Nagar.The closure of the main road for the proposed underpass has led to severe traffic snarls in the area. The temporary arrangement is expected to provide an alternative route for motorists travelling from Ajni Bridge or Chuna Bhatti Square towards Congress Nagar. The measure was proposed earlier this month by DCP (Traffic) Lohit Matani to decongest the busy junction.

Nagpur: BA Flight Resumes After 29 Hours, Toddler Drowns, 6,900 Farmers Hit By Rain And More

While the short-term solution may offer some relief, officials acknowledged that implementing the broader traffic restructuring plan at Ajni Bridge Square is far more complex. PWD engineer Prashant Shankarpure said the temporary road will be completed soon, but noted that the larger traffic management plan requires detailed deliberation. He added that the department would require substantial cooperation from the traffic police for effective implementation.“We have prepared a traffic plan, which will soon be discussed with the traffic police. Given the heavy traffic flow in the area, the project is highly complicated. Several precautionary measures are necessary to prevent mishaps. Therefore, we are reviewing all aspects thoroughly before taking a final decision,” Shankarpure said. The proposed underpass at Ajni Bridge Square is part of a ₹35 crore project that also includes widening the stretch from Ajni Bridge to TB Ward Square into a six-lane road. The expanded corridor will integrate with the Ajni twin cable-stayed bridges being constructed by the Maharashtra Rail Infrastructure Development Corporation (MRIDC).According to the proposed traffic plan accessed by TOI, the PWD has suggested a complete closure of the road from Chuna Bhatti towards Kriplani Square and Congress Nagar during construction. Motorists travelling from TB Ward via Ajni Bridge towards Kriplani Square would be required to proceed to Ajni Square and take Wardha Road to reach their destination.Sources said the PWD is considering closing the entire stretch in the busy area to facilitate construction of the approximately 62-metre underpass, along with a 100-metre approach road that will slope into it.Officials clarified that the final traffic plan will be implemented only after consultations with the traffic department, emphasising that while the temporary road may provide interim relief, resolving the area’s larger traffic challenges remains a complex task.



Source link

Share.
Leave A Reply

Exit mobile version