Srinagar, Aug 06: In what could be termed as a major achievement, Jammu & Kashmir has generated 1,96,415.59 Million Units (MU) of electricity from all sources between 2014-15 and 2025-26, while simultaneously slashing its annual energy shaortfall from 19.1 per cent to just 0.1 per cent during the period, the data on the latest state-wise power generation and supply by Ministry of Power revealed.
According to the details, accessed by Rising Kashmir, the Union Territory generated 14,687.20 MU in 2014-15, which rose to 15,313.52 MU in 2015-16 and 15,703.82 MU in 2016-17. Generation stood at 15,261.93 MU in 2017-18, increased to 16,853.78 MU in 2018-19, and reached its highest level of 18,537.25 MU in 2019-20.
Power generation remained above 17,000 MU for the next three financial years, recording 17,441.97 MU in 2020-21, 17,489.83 MU in 2021-22 and 17,170.62 MU in 2022-23. It subsequently declined to 16,282.93 MU in 2023-24 and 15,595.82 MU in 2024-25, before recovering to 16,076.92 MU in 2025-26. During the first quarter of 2026-27 (Till June 2026), the UT generated 5,812.82 MU.
Overall, Jammu & Kashmir generated around 1,96,415.59 MU of electricity between 2014-15 and 2025-26. With the output for April-June 2026, the cumulative generation touched over 2.02 lakh MU.
The figures indicate that while the Union Territory has maintained relatively stable electricity generation over the years, it continues to rank in the middle tier among states and Union Territories.
It generates considerably more electricity than several smaller states and UTs, including Goa, Sikkim, Tripura, Mizoram, Meghalaya, Nagaland, Arunachal Pradesh, Andaman & Nicobar Islands and Lakshadweep.
However, Jammu & Kashmir remains well behind the country’s major power-producing states such as Gujarat, Maharashtra, Chhattisgarh, Madhya Pradesh, Uttar Pradesh, Tamil Nadu, Rajasthan and Karnataka, each of which records annual generation several times higher than the UT.
The national power generation from all sources increased from 11,10,392.27 MU in 2014-15 to 18,47,941.44 MU in 2025-26, reflecting a steady rise in electricity production across the country, the data reveals.
Official data indicated that the annual power demand has crossed over 3,500 MW in recent years, while local generation often falls well short of the requirement during winter, necessitating large-scale imports of electricity.
Moreover, the power supply data shows a clear improvement in Jammu & Kashmir over the last 12 years, with the gap between energy requirement and availability narrowing sharply.
The data also points to a marked improvement in Jammu & Kashmir’s power supply position over the years. The Union Territory’s annual energy requirement increased from 16,214 MU in 2014-15 to 20,185 MU in 2025-26, while energy availability rose from 13,119 MU to 20,166 MU during the same period.
Consequently, the gap between demand and supply narrowed significantly. The energy not supplied dropped from 3,095 MU (19.1%) in 2014-15 to just 19 MU (0.1%) in 2025-26. After remaining above 3,000 MU between 2016-17 and 2019-20, the deficit declined steadily to 2,551 MU in 2020-21, 1,524 MU in 2021-22, 317 MU in 2022-23, 277 MU in 2023-24, 90 MU in 2024-25, and 19 MU in 2025-26, indicating a near-elimination of the annual energy shortfall.


